77. In addition to the general content prescribed by section 16, every application for authorization for an activity referred to in this Division must include the following supplemental information and documents:(1) if the operation of the site requires snow melters and discharges into a sewer system, a technical report signed by an engineer that can be used to evaluate the capacity of the water treatment station to process the snow and meltwater;
(2) in all other cases, the information and documents required by the second paragraph of section 68 for a residual materials elimination facility, adapted as required.